date_range 2023-12-20 00:00:00
The purpose of this project report have been requested land that has mining potential of black stone quarry on Semen Shoa Zone, AngolalaTeraWoreda, Serite Keble, specific name Meshege. The organization would have objective of supplying and fill the gap of Black stone material shortage in highly blooming construction sectors in the country. As a result of shallow depth and rock nature of sub-layer force to categorize land suitability for Eucalyptus species, control grazing land or quarry mining would be more suitable. The area is bounded by different sister investments and farm land. Starting from land holding period the business had been plan to invest on certified land of two block counting (8000m2) for exploring Black stone raw materials in Amhara regional administrative state, north Showa zone AngolalaTeraWoreda, Serite Keble, specific name Meshege, about 100 km some distance from main road to the north of Addis Ababa. The main driving force encouraging the owner to invest on Black stone quarry mining is access of raw material besides, more experience in the sectors, potential of capital for investment (low cost tools and equipment for excavation), access of labors in quarry site, demand of Black stone in the area for construction, and encouraging policy set for investors to upgrade from traditional production to small scale types. The proposed business whose primary activity would be exploring 8000m3of Black stone mining left on already hold area of land (8000m2) and to deliver the output to domestic marketwithin4 year life cycle periods by total investment cost of 5,000,000 birr. The project intends to create job opportunity for an average of 10 permanent and 47temporary employees, besides transferring technology of rehabilitation and reclamation implemented at the end of one year and during decommissioning periods. The most attractive nature of the project besides the one mention above would be the funding source totally covered by the organization